
| UIC: | 21839 | |||
| Class: | AOE 6 | Fleet: | Atlantic | |
| Status: | Military Sealift Command (MSC) Naval Fleet Auxiliary Force | Homeport: | ||
| Date status changed: | 07/13/2001 | Berth: | ||
| Maintenance Category: | ||||
| Force: | Battle Force | MARAD Type: | ||
| Builder: | NATIONAL ST & SB | |||
| Delivery Date: | 01/31/1994 | |||
| Award Date: | 01/22/1987 | Age (since delivery): | 18.1 years | |
| Keel Date: | 02/24/1989 | Commission Date: | 02/26/1994 | |
| Launch Date: | 10/06/1990 | Inactivation Date: | ||
| Age (since launch) | 21.3 years | Decommission Date: | 07/13/2001 | |
| Years from Commission to Decommission: | 7.4 | |||
| Stricken Date: | ||||
| Overall Length: | 754 ft | Waterline Length: | 730 ft | |
| Extreme Beam: | 107 ft | Waterline Beam: | 107 ft | |
| Maximum Navigational Draft: | 40 ft | Draft Limit: | 41 ft | |
| Light Displacement: | 20796 tons | Full Displacement: | 50858 tons | |
| Dead Weight: | 30062 tons | |||
| Hull Material: Steel hull, steel superstructure. | ||||
| Number of Propellers: 2 | ||||
| Number of Waterjets: | ||||
| Propulsion Type: Gas Turbines | ||||
| Accommodations: | Officers: 45 | Enlisted: 663 |
| Custodian: | MILITARY SEALIFT COMMAND | Ships Program Manager: | MSC |
| Planning Yard: | Military Sealift Command |
| Last updated 08/26/2011 |
| | RELATED LINKS
| DOD DISCLAIMER | | SHIPS | SERVICE CRAFT | HOME | |
NAVSHIPSO NAVSEA Shipbuilding Support Office Norfolk Naval Shipyard Code 284, Bldg 705 Portsmouth, VA 23709-5000 (757) 967-3484 (757) 967-2957 (FAX)
|